Javascript is not enabled
Javascript is not enabled
Javascript is not enabled
Javascript is not enabled
Javascript is not enabled
Javascript is not enabled
Javascript is not enabled
Javascript is not enabled
Arquivo Nacional Torre do Tombo
SIMPLE SEARCH
ADVANCED SEARCH
HIGHLIGHTS
ONLINE SERVICES
HELP
Javascript is not enabled
"Sea wall, inclined plan and embankment end of November, all the embankment near the sea wall was made by the dredging machine". = Muralha, plano inclinado e aterro em finais de Novembro, todo o aterro contíguo à muralha foi feito por uma draga.
PT-TT-CMZ-AF-GT-I-2-5-23
TT-CMZ-AF-GT-I-2-5-23_m5504.tiff
© 2008 - DGARQ - Direcção-Geral de Arquivos |
Mapa do Sítio
|
Comentários e Sugestões
|
Contactos
|
Javascript is not enabled
Javascript is not enabled
Javascript is not enabled
Javascript is not enabled