"Sea wall, inclined plan and embankment end of November, all the embankment near the sea wall was made by the dredging machine". = Fim dos trabalhos do aterro, concluídos, em Novembro. Junto à muralha houve a necessidade de recorrer a uma máquina de dragagem.
PT-TT-CMZ-AF-GT-I-2-5-24
TT-CMZ-AF-GT-I-2-5-24_m5505.tiff