Javascript is not enabled
Javascript is not enabled
Javascript is not enabled
Javascript is not enabled
Javascript is not enabled
Javascript is not enabled
Javascript is not enabled
Javascript is not enabled
Arquivo Nacional Torre do Tombo
SIMPLE SEARCH
ADVANCED SEARCH
HIGHLIGHTS
ONLINE SERVICES
HELP
Javascript is not enabled
"Inclined plan in November (this work now has stopped) actually the plan properly so called is not built but only the wing walls and the site for the swing -bridge". = Plano inclinado, em Novembro (esta obra foi parada), actualmente o plano propriamente dito, assim designado, não foi construído mas somente as paredes protectoras e o local para a ponte giratória.
PT-TT-CMZ-AF-GT-I-2-5-27
TT-CMZ-AF-GT-I-2-5-27_m5508.tiff
© 2008 - DGARQ - Direcção-Geral de Arquivos |
Mapa do Sítio
|
Comentários e Sugestões
|
Contactos
|
Javascript is not enabled
Javascript is not enabled
Javascript is not enabled
Javascript is not enabled